Palouse-Clearwater Environmental Institute

“connecting people, place and community”

  • Learning
    • Palouse Roots
    • Community Education
    • School Programs
    • ENGAGE at Paradise Ridge
  • Serving
    • Volunteer with PCEI
    • AmeriCorps
    • Adopt-A-Stream Program
  • Restoring
    • Projects
    • Services
    • John Crock Learning Nursery
    • Plants
    • Useful Links
  • Living
    • Sustainable Living Projects at PCEI
    • Community Resources
    • The Plate Project
  • Nature Center
    • Nancy Taylor Stage and Pavilion
    • John Crock Learning Nursery
    • Thomas O. Brown Learning Greenhouse
    • The LaFortune “Groover”
    • Solar Power
    • Pump Track
    • NestWatch at the PCEI Nature Center
  • Rose Creek
    • Birding at Rose Creek
  • Events
    • See all events
    • 11/18: PCEI Annual Membership Meeting
    • 2020 Volunteering
  • Join/Donate
  • About PCEI
    • Mission & Goals
    • Our People
    • Job Openings
    • Our History
    • Our Funders
    • Our Newsletter
    • Awards and Recognition
    • Contact Us

South Fork Clearwater River Watershed Riparian Restoration – Rylaarsdam Project

bunches_o_volunteersWatershed: South Fork Clearwater River
Stream Name: Threemile Creek
Date Established: 05/15/2006
Project Status: Complete; maintenance and monitoring underway

 

Overview

Funding Agency: Department of Environmental Quality

Project Location: Latitude 45.9761 N Longitude 116.0806 W

Target Pollutants:

  • Sediment
  • Temperature
  • Nutrients
  • Bacteria

Waterbody Type(s): Perennial

Hydrologic Unit Code: 17060305

Description

The South Fork Clearwater River (SF CWR) Riparian Restoration Project is designed under the guidance of the SF CWR Watershed Advisory Group (WAG) and the SF CWR Total Maximum Daily Load (TMDL), and represents activities identified in the SF CWR TMDL Implementation Plan. Restoration will reduce sediment and temperature, pollutants for which the TMDL on SF CWR was established, and will also reduce bacteria and nutrients, while improving riparian habitat. The restoration of a variable width buffer will provide shad and help to reduce extreme summer temperatures. Contributions of organic and woody material to the stream system will improve the structural complexity of the stream system, while also improving in-stream habitat for aquatic species.Riparian restoration activities on the Rylaarsdam property complement conservation measures being implemented by Idaho Soil and Water Conservation District. These activities include the removal of cattle from the riparian area and fencing. Additional work will include off stream watering.

Riparian restoration includes the sloping and stabilization of an estimated 2,800 feet of eroding stream bank, the re-development of an estimated 400 feet of low flow channel and the planting of an estimated 42,000 square feet of variable riparian buffer. Wetland swales will be included in the restoration design to provide additional filtration potential and increase flood water holding capacity.

Previous Conditions

According to the SF CWR TMDL, temperatures in excess of the water quality standards for beneficial use of cold-water aquatic life (19 C) and the more conservative salmon spawning criteria (9 C) are assumed to be the result of loading from the smaller headwater tributaries to the main stem system. In the Threemile Creek watershed, agriculture, grazing, urban development, and road construction activities have reduced vegetative cover and altered stream channel structure, resulting in bank instability and elevated summer water temperatures. Livestock grazing in the riparian area is also contributing to elevated bacteria and nutrients in Threemile Creek.

Photo History:

deepcreek_erodedbankBank Before Excavation (April 2005): The steep eroded banks of Three Mile Creek. As stream banks like this slough off into the water, they deposit loads of sediment, contributing to pollution and decreasing biodiversity.

Deepcreek_1Banks: Banks after resloping, remeandering, and with biologs and erosion control fabric.

resizedsept1 copyExcavation and Installation of Biologs: Ken places Biologs while the excavator follows behind, carving the slope of the bank into a gradual rise, as opposed to the steep erosion that had occurred before the restoration project began.

wetlandplants824Wetland Plants: To increase biodiversity, PCEI places wetland plants like these near or in streams. The varied root structures provided by a diverse mix of trees, shrubs, rushes, and sedges helps stabilize a streambank.

30studentsUniversity of Idaho Students Help Out: On Saturday, September 30th, 30 volunteers from the University of Idaho travelled to the Three Mile Creek site in Grangeville and helped plant 175 trees and shrubs.

WTMC1_2518.planting1+ copyUI Volunteers in Action: Two volunteers from the University of Idaho plant trees in an effort to revegetate the riparian are with native vegetation. Volunteer events like this one that occurred on Saturday, September 30th, 2006, are crucial to meeting project goals.

OLYMPUS DIGITAL CAMERAWetland! A newly created wetland on the project site filled with water just days after it was excavated. The fabric in the foreground will keep soil from eroding and washing downstream as water from the wetland spills over during high water. Later, many wetland plants were placed in the wetland, either submerged or planted close to the waterline.

tmc_rapidsCulvert Before Restoration: This photo was taken in April of 2005 and shows the previous condition of the stream, close to where the wetland now is.

exc_reslopeExcavator Resloping Streambank: The excavator in action, sculpting the slope of the streambank.

exc_w_biologExcavator With Biolog: The excavator helps in placing biologs in the stream. The biologs are made of biodegradable fiber and help maintain the new slope and shape of the stream. Plants can easily grow around and even through them.

WTMC_1_03_10_07_tree-plantiSpring Tree planting! Volunteers and AmeriCorps members planted 350 plants along the wetland and stream banks in the spring of 2007.

WTMC_1downstream06_21_07webLush Summer Vegetation: The vegetation has thrived at Threemile Creek! The native plants are doing well, but so are the weeds! The AmeriCorps watershed team along with volunteers have been spending many hours with weed maintenance.

WTMC1_09-08-07_Survival-couPlant Survival Counts: In early September the Watershed crew visited this site to water all the plants, mow down some of patches of weeds and perform a survival count of the plants. This dry, hot summer was a bit hard on the plants, but there is an overall survival rate of about 80%!

  • Restoring Home
  • Restoration Projects
    • Snake River Subbasin
      • Tammany Creek
        • Lucky Acres Arena
        • Best Management Practices Demonstration Project
    • Clearwater River Subbasin
      • Schaub Ranch
      • Lindsay Creek
        • Walton, Cowger and Neilson Property
      • Partridge Creek
        • Christianson Meadows
      • Potlatch River
        • Troy High School Restoration of Little Bear Creek
      • South Fork Clearwater River
        • Rylaarsdam Project
        • Kirtner Property
        • Native Vegetation Establishment Project: A Multiple Landowner Cooperative
    • Palouse River Subbasin
      • South Fork of the Palouse River
        • Fountain Property
        • Howard Property
        • Mill Road Bank Stabilization Project
        • Upper Watershed Project, Robinson County Park
        • Lower Watershed Project
      • Deep Creek
        • Adler Property
        • Espy Property
      • Flannigan Creek
        • Broyles and Reynolds Property
      • Paradise Creek
        • Bailey-Davis-Shipley
        • Berman Creekside Park
        • Big Draw
        • Bridge Street Park
        • Bridge Street: Residential
        • Brockington
        • Carol Ryrie Brink Nature Park
        • Chipman Trail
        • Dogwood Court
        • Fire Station
        • Forbes
        • Garton Hardened Rock Crossing
        • Good Samaritan Village
        • Hall and Mountain View
        • Harden Road
        • Heron’s Hideout
        • Joseph Street
        • Leffingwell-Reid
        • Lefors
        • Lightfield
        • Meadow Street #1
        • Meadow Street #2
        • Morton
        • Morton Extension
        • Moscow Wastewater Treatment Plant
        • Mountain View Park
        • Orchard
        • PCEI Nature Center
        • Remington
        • Renaissance Charter School
        • State Line
        • Streets
        • Styner Avenue
        • Sweet Avenue
        • Townsend Property
        • University of Idaho
        • White Avenue
        • Willard
  • Restoration Services
  • John Crock Learning Nursery
  • Plants
    • Plants for Wetland Restoration on the Palouse
    • Palouse Prairie Native Plants
    • Palouse Prairie Weeds
    • What is a Noxious Weed?
    • Sources for Native Plants
  • Useful Restoration Links
  • Our History
  • FAQ
  • Job Openings
  • Volunteer
  • Privacy Policy
  • Refund Policy

Mailing Address

Palouse-Clearwater Environmental Institute
PO Box 8596
Moscow ID 83843

*Please mail correspondence and checks to our PO Box, NOT our physical address. USPS does not deliver mail to 1040 Rodeo Drive. UPS and Fedex deliveries are accepted at our Rodeo address.

Contact Us

Phone: (208) 882-1444

Email: info@pcei.org

 

  • Facebook
  • Instagram
  • Twitter
  • YouTube

Copyright © 2021 · Dynamik-Gen on Genesis Framework · WordPress · Log in